The main process of the system:
1. Solidify the wall into holes while drilling
2. Install the process casing structure.
3. Fill the gravel in the outer water chamber to establish an efficient circulating heat recovery and storage channel.
4. Clean water is injected into the positive pressure circulating hole washing to replace the slurry, and the circulating heat recovery and storage medium is output for vacuum insulation.